Physical installation involves positioning the main generator unit, mounting the tube support structure (ceiling rail, floor stand, or U-arm configuration), installing the patient table and wall Bucky stand, and setting up the flat panel detector and workstation. Each component has specific mounting requirements and alignment procedures that must be followed precisely.
: Run the automated filament heating calibration cycle to map the tube current ( ) characteristics.
Adjust the internal mirrors so the light field matches the actual X-ray exposure area within a 2% margin of error. drgem x ray service manual install
Insert the plugs fully into the generator sockets and tube housings, making sure they are locked into the correct terminals (Anode to Anode, Cathode to Cathode). Tighten the retaining rings securely. 5. Electrical Wiring and System Interconnections
: Connect the Automatic Exposure Control (AEC) chambers and motorized grid cables to the corresponding ports on the generator PCB. 4. Software Configuration and Network Setup Adjust the internal mirrors so the light field
Drgem distributes service documentation in three common ways:
[ High-Voltage Generator ] │ ├───► High-Voltage Cables (Anode/Cathode) ───► [ X-Ray Tube ] ├───► Low-Voltage Control Cable ───► [ Collimator ] ├───► Stator Cable ───► [ Tube Stator Motor ] ├───► Hand Switch / Foot Switch │ [ System Console PC ] ◄─── Ethernet / Fiber ─────► [ Flat Panel Detector ] High-Voltage (HV) Cable Connection A deeper dive into
Balance the counterweights or calibrate the spring tension of the vertical column so the tube assembly moves smoothly up and down. High-Voltage (HV) Cable Connection Locate the anode and cathode HV cables.
Check the outer wooden crates for shipping damage before opening.